| ||||||||||
|
|
![]() ![]() TM 11-5985-362-13
·
Two crewmembers proceed to antenna transit case and each obtain a MAIN FEEDLINE WINCH and cable
clamp WRENCH.
·
One crewmember proceeds to original ANCHOR 1, the other to original ANCHOR 6.
·
Attach MAIN FEEDLINE WINCHES to original ANCHORS 1 and 6 .
·
Attach wire/cable grippers of MAIN FEEDLINE WINCHES at ANCHORS 1 and 6 to MAIN FEEDLINE.
·
Apply enough tension (by cranking winches) to MAIN FEEDLINE to allow removal of cable clamps.
·
Using wrenches, remove CABLE CLAMPS on MAIN FEEDLINE at ANCHORS 1 and 6.
·
(Refer to page 2-6 for procedure.) Disconnect the VERTICAL FEEDLINE and VERTICAL CATENARY from
their pound-in anchors.
·
Remove tension completely from the MAIN FEEDLINE with MAIN FEEDLINE WINCHES.
·
Disconnect MAIN FEEDLINE WINCHES at original ANCHORS 1 and 6.
Relocate and attach to new
ANCHORS 1 and 6.
·
With one crewmember at each original ANCHOR 7 (RIGHT and LEFT SIDE), disengage the rope tensioners
of BACK RADIATOR GUYS AND CATENARIES from their anchors. (Refer to page 2-5 for operation.)
·
Keep a slight tension on the RADIATOR GUYS and CATENARIES.
2-53
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |