Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR ASSEMBLY OF SECTIONS-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
PREPARATION FOR ASSEMBLY OF SECTIONS-continued
Up
TM-11-5985-362-13 Antenna Group OE-317/TSC-99 (NSN 5895-01-095-6206) Manual
Next
TOWER ASSEMBLY

TM 11-5985-362-13
·
Move reeling machine three tower sections toward TOWER BASE.  Position reeling machine facing right side
ANCHOR (6). Repeat above two steps to unreel right and left side steel/rope LOWER TOWER GUYS.
·
Face reeling machine toward ANCHOR 6 (rear of antenna). Completely unreel third steel/rope LOWER TOWER
GUY. Aline guy one foot to the right side of CENTER LAYOUT WIRE to prevent interference with assembly of tower
sections.
·
Move reeling machine to ANCHOR 6. Remove empty REEL NO. 1 from axle and return to antenna transit case.
Change 1 2-25

Privacy Statement - Press Release - Copyright Information. - Contact Us