Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR ASSEMBLY OF SECTIONS-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
PREPARATION FOR ASSEMBLY OF SECTIONS
Up
TM-11-5985-362-13 Antenna Group OE-317/TSC-99 (NSN 5895-01-095-6206) Manual
Next
PREPARATION FOR ASSEMBLY OF SECTIONS-continued

TM 11-5985-362-13
·
From antenna transit case obtain GIN POLE TOP PLATE, TOWER TRANSITION PLATE, TOWER TOP PLATE,
and 12 TOWER SPLICES. Distribute selected items by placing on ground next to section joints as follows:
a. GIN POLE TOP PLATE and three TOWER SPLICES at end of second SMALL TOWER SECTION nearest
ANCHOR POSITION 6.
b. TOWER TRANSITION PLATE and six TOWER SPLICES between last LARGE TOWER SECTION and first
MEDIUM TOWER SECTION.
c. TOWER TOP PLATE and three TOWER SPLICES at end of fourth MEDIUM TOWER SECTION nearest
ANCHOR POSITION 1.
·
From antenna transit case obtain the remaining 27 TOWER SPLICES, place three at each tower section joint and six
at the TOWER BASE.
·
From antenna transit case, remove REEL NO. 1. With reel on ground, insert axle RL-27-(*).
·
Position reeling machine at end of the lost MEDIUM TOWER SECTION nearest ANCHOR 1 in direction of right side
ANCHOR (6). Place axle with REEL NO. 1 on reeling machine.
·
With one crewmember attending reeling machine other crewmember carries end of top ROPE TOWER GUY (right
side) towards ANCHOR (6) until completely off reel.
·
Rotate reeling machine 120 degrees counterclockwise in direction of left side ANCHOR (6) and repeat above step for
left side ROPE TOWER GUY.
Change 1 2-23

Privacy Statement - Press Release - Copyright Information. - Contact Us