Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR ASSEMBLY OF SECTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ANCHOR (6) (RIGHT AND LEFT SIDES)-continued
Up
TM-11-5985-362-13 Antenna Group OE-317/TSC-99 (NSN 5895-01-095-6206) Manual
Next
PREPARATION FOR ASSEMBLY OF SECTIONS-continued

TM 11-5985-362-13
d. PREPARATION FOR ASSEMBLY OF SECTIONS
Assembly of both the TOWER and GIN POLE is done by two crewmembers working together. Since all tower
and gin pole section legs are the same size, standard TOWER SPLICES are used for the assembly. Proceed as
follows:
·
From mast transit case, remove the four LARGE TOWER SECTIONS and place end to end alongside
CENTER LAYOUT WIRE from TOWER BASE towards ANCHOR 1.
·
From mast transit case, remove the four MEDIUM TOWER SECTIONS and place end to end alongside
CENTER LAYOUT WIRE from end of last LARGE TOWER SECTION towards ANCHOR 1.
·
From mast transit case, remove the two SMALL TOWER SECTIONS and place end to end alongside
CENTER LAYOUT WIRE from TOWER BASE towards ANCHOR 6.
·
From antenna transit case, remove TOWER/GIN POLE BASE, two HINGE PINS, two RETAINING PINS and
carry to TOWER BASE.
·
With legs on the TOWER/GIN POLE BASE facing toward ANCHOR 1 aline holes in base with holes in
TOWER BASE, insert both HINGE PINS from inside to outside.
2-22

Privacy Statement - Press Release - Copyright Information. - Contact Us