| ||||||||||
|
|
![]() ![]() TM 11-5985-362-13
·
Third crewmember takes the end of CENTER LAYOUT WIRE (at SLEEVE with marker tag 6), one 30 inch anchor
and walks counterclockwise to SLEEVE with marker tag 6 on BACK LAYOUT WIRE.
·
Holding both SLEEVES together, hand tension wires to form a triangle.
·
Insert point of anchor (at intersection of SLEEVES) into ground to mark location for LEFT SIDE ANCHOR (6).
·
Leave 30 inch anchor, proceed clockwise with end of CENTER LAYOUT WIRE (SLEEVE with marker tag 6) and pick
up other 30 inch anchor.
·
Walk to SLEEVE with marker tag 6 on BACK LAYOUT WIRE.
·
Holding both SLEEVES together, hand tension wires to form a triangle.
·
Insert point of anchor (at intersection of SLEEVES) into ground to mark location for RIGHT SIDE ANCHOR (6).
·
Leave 30 inch anchor, return CENTER LAYOUT WIRE to its original position (straight line between ANCHOR 1 and
6).
·
Obtain shovel/pick and antenna coupler bar from antenna transit cases and install the four 30 inch anchors as
follows:
2-20
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |