Click here to make tpub.com your Home Page

Page Title: ANCHOR POSITION 7 (RIGHT AND LEFT SIDES)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ANCHOR POSITION 7 (RIGHT AND LEFT SIDES)
Up
TM-11-5985-362-13 Antenna Group OE-317/TSC-99 (NSN 5895-01-095-6206) Manual
Next
ANCHOR (6) (RIGHT AND LEFT SIDES)

TM 11-5985-362-13
·
Once alined, leave wire on the ground and return to reeling machine. Attending crewmember at reeling machine
holds SLEEVE with marker tag 7.
·
Two crewmembers remove axle with REEL NO. 4 and walk toward clamp 3 on the CENTER LAYOUT WIRE until
SLEEVE with marker tag 3 is free of reel.
·
Insert SLEEVE with marker tag 3 into CLAMP 3. Tighten clamp wingnut securely.
·
Crewmember from reeling machine moves to CLAMP 3 on CENTER LAYOUT WIRE and holds it in position.
·
Two crewmembers with axle walk to SLEEVE with marker tag 7 at left end of BACK LAYOUT WIRE until SIDE
LAYOUT WIRE is free of reel.
·
Return empty REEL NO. 4 to antenna transit case and obtain two 30 inch anchors.
·
Position one crewmember at CLAMP 3, and one at the TOWER BASE to hold wires in position.
·
Apply tension to left side ends of the SIDE and BACK LAYOUT WIRES to form a triangle.
·
With one 30 inch anchor mark point where the ends (SIDE and BACK LAYOUT WIRES) with marker tag 7 meet.
Leave anchor for later installation (LEFT SIDE ANCHOR 7).
·
Proceed to right side ends (SLEEVE with marker tag 7) of SIDE and BACK LAYOUT WIRES and mark point with
other 30 inch anchor for later installation (RIGHT SIDE ANCHOR 7).
2-18

Privacy Statement - Press Release - Copyright Information. - Contact Us