Hand tension the center LAYOUT WIRE from ANCHOR 6 to anchor position 1 with one crewmember at each end
(holding SLEEVES with marker tags 6 and 1).
·
At SLEEVE with marker tag 1, insert point of 66 inch anchor into ground for follow-up installation by assigned
crewmembers.
·
Two crewmembers hold tension on CENTER LAYOUT WIRE.
·
Third crewmember positions the TOWER BASE, alining SLEEVE (with marker tag 5) on CENTER LAYOUT WIRE
with line and arrowhead on base.
·
Using hammer drive four TOWER BASE PINS into the ground until all four pin heads are securely against the
top of tower base.