Click here to make tpub.com your Home Page

Page Title: LOCATING ANCHOR POSITIONS AND TOWER BASE-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
LOCATING ANCHOR POSITIONS AND TOWER BASE-continued
Up
TM-11-5985-362-13 Antenna Group OE-317/TSC-99 (NSN 5895-01-095-6206) Manual
Next
ANCHOR POSITION 7 (RIGHT AND LEFT SIDES)

TM 11-5985-362-13
·
Hand tension the center LAYOUT WIRE from ANCHOR 6 to anchor position 1 with one crewmember at each end
(holding SLEEVES with marker tags 6 and 1).
·
At SLEEVE with marker tag 1, insert point of 66 inch anchor into ground for follow-up installation by assigned
crewmembers.
·
Two crewmembers hold tension on CENTER LAYOUT WIRE.
·
Third crewmember positions the TOWER BASE, alining SLEEVE (with marker tag 5) on CENTER LAYOUT WIRE
with line and arrowhead on base.
·
Using hammer drive four TOWER BASE PINS into the ground until all four pin heads are securely against the
top of tower base.
2-16

Privacy Statement - Press Release - Copyright Information. - Contact Us