| ||||||||||
|
|
![]() ![]() TM 11-5985-284-15
DEPOT OVERHAUL STANDARDS
standards of Antenna, Loop AT784/PRC, use the
6-1. Scope
procedures for the general support testing pro-
The depot overhaul standards for Antenna,
cedures given in paragraphs 53 through 5-8.
Loop AT-784/PRC, are designed to measure the
The tools and test equipment required for the pro-
performance capability of repaired equipment.
cedures are given in paragraph 5-4. If the FINE
Equipment that meets the minimum standards
TUNE control is consistently beyond position 2
stated in the tests will furnish satisfactory opera-
during the frequency range tests (para 5-7),
tion, equivalent to that of new equipment.
adjust coil L1 and capacitor C3 using the pro-
cedures in paragraph 5-2. After the adjustment,
To perform the tests for the depot overhaul
repeat the frequency range tests ( para 5-7).
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |