|
| |
Back Figure 4-20. Right Front Condenser Panel Installation | Up TM-9-4120-381-14 Air Conditioner Vertical Compact 18 000 BTU/HR 208 Volts 3 Phase 50/60 Hz Manual | Next Section IV. UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES |
ARMY TM 9-4120-381-14
NAVY EE-000- CA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-31
4-14. FRONT ACCESS PANELS INSTALLATION - Continued.
f. Install Left Front Evaporator Panel. Connect hose (1), tighten clamp (2), install panel (3), and tighten five captive
fasteners (4) (see Figure 4-23).
Figure 4-23. Left Front Evaporator Panel Installation
g. Install Center Front Evaporator Panel. Install panel (1) and tighten eight captive fasteners (2) (see Figure 4-24).
Figure 4-24. Center Front Evaporator Panel Installation
4-14
|