Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 5–4. Sight glass, removal and installation.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure  5-3.  Electric  heater,  removal  and  installation.
Up
TM-5-4120-308-15 Air Conditioner: Compact Vertical 208V 3 Phase 60 000 BTUH Cooling Manual
Next
Figure   5–5.   Regulating of   operation,   stop   the   unit   and   check   the   electrical connection   and   solenoid   valve   coil   (para   5–14). c. Removal. (1)   Discharge   the   refrigerant   system   p a ra 6-3). (2)   Refer   to   figure   5-6  and   remove   the   pres- sure equalizer solenoid valve. d.   Installation. (1)  Install   the   solenoid   valve   in   reverse order of removal. (2)   Pressure   test,   evacuate,   and   recharge the  refrigerant  system  (para  6-5). 5-16. Compressor Bypass and Pressure Equalizer Solenoid Valve Repair a.    Disassernbly. (1)  Refer  to  figure  5-7  and  disassemble  the compressor  bypass  or  the  pressure  equalizer  sole- noid valve. valve,   removal   and   installation.

Figure  5–4.  Sight  glass,  removal  and  installation. b. Testing. (1)  Refer  to  figure  3-4  and  remove  the  top access  cover. (2)   Refer   to   figure   5-11   and   remove   the four   screws   attaching   the   high-and   low-pressure cutout  switch  enclosure  to  the  casing.  Swing  en- closure  upward  to  allow  access  to  solenoid  valve. Caution:  When  swinging  enclosure  up  be especially  careful  not  to  kink  or  pinch   the   high. and   low-pressure   cutout   switch   capillary   tubes extending  from  the  enclosure. (3)   Start   the   air   conditioner   (para   2-8).   In the  bypass  mode  of  operation  of  tubing  from  the discharge  side  of  valve  (as  indicated  by  arrow  on valve  body  )  should  become  warm  immediately.  If not,  stop  the  unit  and  check  the  electrical  connec- tion   and   solenoid   valve   coil   (para   5-14).   If   the valve  fails  to  click  upon  start  of  the  bypass  mode 5-8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing