Click here to make tpub.com your Home Page

Page Title: LIST OF ILLUSTRATIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table Of Contents
Up
TM-5-4120-222-14 Air Conditioner: Compact Vertical 208 3 Phase: 18 000 BTUH Cooling 12 000 BTUH Heating (Trane Models) Manual
Next
Chapter 1. INTRODUCTION

LIST OF ILLUSTRATIONS
NUMBER
TITLE
PAGE
Air Conditioner, Left-Front Three-Quarter View, with Shipping Dimensions --------------------------
A i r  Conditioner,  Right-Rear  Three-Quarter  View  ------------------------------------------------
Base
Plan---------------------------------------------------------------------------------------------------------------------------
Practical  Wiring  Diagram------------------------------------------------------------------------------------------------------------
Remote  Control  Connection  Installation---------------------------------------------------------------------------------------
Controls
and
Instruments----------------------------------------------------------------------------------------------------------
Starting
Instructions-----------------------------------------------------------------------------------------------------------------
Stopping Instructions------
Operating
Instructions------------------------------------------------------------------------------------------------------------
Servicing Mist Eliminator and Air Conditioning Filter--------------------------------------------------------------------
Servicing Evaporator Coil and Condenser Coil-----------------------------------------------------------------------------
Cover Panel, Discharge Grille, Intake Grille, and Front Access Panel, Removal
and Installation----------------------------------------------------------------------------------------------------------------------------------------------
Mist Eliminator and Air Conditioning Filter, Removal and Installation-----------------------------------------------
Fresh Air Inlet Screen, Chemical and Biological Cover, Fan Guard, and
Condenser Coil Grille and Screen, Removal and Installation-----------------------------------------------------
Evaporator Fan Inlet Ring, Removal and Installation-----------------------------------------------------------------
Condenser Fan Removal and Installation------------------------------------------------------------------------------------
Blower Motor, Removal and Installation _
Refrigerant
Flow
Diagram
___
______
_________
Blower Motor Disassembly and Reassembly (Model CE20VAL4)
Power  Receptacle  Connector  Removal  and  Installation  --------------------------------------------
Compressor Overload Protector and Heater Thermostat
O u t d o o r  Thermostat  Removal  and  Installation  ----------------------------------------------------
E l e c t r i c a l Heater Thermostat Removal and Installation --------------------------------------------
Control Box Front Panel and Control Panel Removal and Installation ------------------------------
Control  Panel,  Disassembly  and  Reassembly
Phase Sequence Relay, Circuit Breaker, Rectifier, Terminal Blocks, Contractors,
Receptacle Connectors, and Control Box, Removal and Installation --------------------------------
Electrical Heater Elements and Back Pressure Regulating Valve, Removal
and Installation-----------------------------------------------------------------------------------------
Service Valves, Removal and Installation--------------------------------------------------------
Thermostatic Expansion Valves Removal and Installation
O n e - T o n Thermostatic Expansion Valve Adjustment ----------------------------------------------
P r e s s u r e - T e m p e r a t u r e  Curve  for  Refrigerant-22  --------------------------------------------------
Hot Gas By-Pass Solenoid Valve, and High Pressure Cutout Switch, Removal
and
Installation
------------------------------------------------------------------------------
Hot Gas By-Pass Solenoid Valve, Disassembly and Reassembly ------------------------------------
Liquid Line Solenoid Valve and Liquid Line By-Pass Solenoid Valve, Removal
and
Installation
-----------------------------------------------------------------------------
Liquid Line Solenoid Valve and Liquid Line By-Pass Solenoid Valve Disassem-
bly and Reassembly ---------------------------------------------------------------------------
Dehydrator and Pressure Relief Valve, Removal and Installation ------------------------------------
Sight Glass Removal and Installation ----------------------------------------------------------
E v a p o r a t o r  Coil  Removal  and  Installation  --------------------------------------------------------
C o n d e n s e r  Coil,  Removal  and  Installation  --------------------------------------------------------
C o m p r e s s o r ,  Removal  and  Installation  -------------------------------------------------------------
Compressor Heater and Compressor Oil Level Plug, Removal, Disassembly and
Installation
Casing, Base, and Duct Assembly, Removal, Disassembly, Reassembly, and
61,62
Installation
Pressure Testing and Evacuating the Refrigerant System ------------------------------------------ 64-66
Charging  the  Refrigerant  System-------------------------------------------------------------------------------------------------67-69
Discharge Pressures at Constant 55 psi Suction, Ambient Temperatures from
70°  to  120°F.
AGO 20053A
2

Privacy Statement - Press Release - Copyright Information. - Contact Us