| ||||||||||
|
|
![]() ![]() TM 5-4110-240-13&P
B-Before operation
D-During operation
W-Weekly
M-Monthly
ITEM
INTERVAL
ITEM TO BE INSPECTED
EQUIPMENT WILL BE REPORTED
NO.
B DWM
PROCEDURE
NOT READY IF:
14
··
Vapor Proof Light and Bulb. Check for
Vapor proof light fixture or
cracks, breaks, and loose or missing
globe are damaged.
hardware.
15
·
Vapor Proof Light Bulb. Unscrew globe
Vapor proof light bulb is
to expose bulb. Inspect bulb for
unusable.
serviceability.
16
·
Power Receptacle. Check for cracks,
Power receptacle is
damaged pins or cover, and loose or
damaged.
missing hardware.
Change 2
2-9
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |