Click here to make tpub.com your Home Page

Page Title: Table 2-2. Operator's Preventive Maintenance Checks and Services (Weekly) - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 2-2. Operator's Preventive Maintenance Checks and Services (Weekly) - continued
Up
TB-9-2320-364-13-P-1 Air Conditioning System NSN 4120-01-526-9153 P/N 3528349 for Truck Tractor M1074/M1075 Palletalized Load System (PLS) Manual
Next
SYSTEM OPERATION

DRAFT
TB 9-2320-364-13&P-1
OPERATOR'S PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) -
Continued
Table 2-2.
Operator's Preventive Maintenance Checks and Services (Weekly) (Continued)
Location
Item
Not Fully Mission
Interval
Item to
Procedure
No.
Capable if:
Check/Service
PLSAC125
6
Weekly
AC Heater/
(a) Check AC evaporator core (1) for debris,
Evaporator and
dirt, damage, and oil residue.
Drain Hoses
(b) Open front access cover (2) in front of
truck.
(c) Check two AC evaporator drain hoses (3)
underneath cab. Notify Field Level
Maintenance if drain hoses are clogged
or kinked.
END OF WORK PACKAGE
0003-7/(0003-8 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us