Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: f. PITOT-AD SNSR anti-ice system
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive

Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
20.   Anti-ice systems
Up
TM-1-1520-238-MTF Maintenance Test Flight Manual Helicopter Attack AH-64A Apache
Next
21.   IHADSS – Boresight

TM 1-1520-238-MTF 2-26 PROCEDURE TROUBLESHOOTING REFERENCE AFTER STARTING APU (CONT) *e.   Ice-detector – Have crewmember touch tip. Verify ice severity meter needle movement, ENG ICE cau- tion/warning segment illuminated, and detector heated. Release de- tector and verify ENG ICE caution/ warning segment extinguished in approximately 90 seconds. *f.   PITOT-AD SNSR anti-ice system – Test as follows: (1)   ANTI-ICE panel PITOT AD SNSR and ENG INLET switches – ON. Verify ENG 1 ANTI ICE and ENG 2 ANTI ICE caution/warning segments illu- minate. (2)   Have crewmember touch pitot tubes and nose gearbox fairings to verify heating. (3)   ADSS switch – OFF. Have crewmember touch sensor and verify heating. (4)   Ice detector unit – Have crew– member verify presence of PAS air and that the exterior housing is heated. (5)   Set pilot and CPG switches as desired. A12

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing