Next LATERAL BELLCRANK AND LATERAL LINKS INSTALLATION
TM 1-1520-238-2311-7511.10.LATERAL BELLCRANK AND LATERAL LINKS REMOVAL continued11.10.4. Cleaninga. Wipe removed and attaching parts with a clean rag.11.10.5. Inspectiona. Check removed and attaching parts for damage (para 11.5).b. Check removed and attaching parts for corrosion (para 1.49).c. Check all installed bushing(s) and/or bearing(s) for wear (para 11.5).d. Check all removed bushing(s) and/or bearing(s) for wear (para 11.4).END OF TASK