Click here to make tpub.com your Home Page

Page Title: PROCEDURES cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 5. Bolt Tightening Pattern for the Lower Clamp Ring
Up
TB-1-1520-251-20-13 Replacement of Flange Ring on Electrical Power - Generator A.C. for AH-64D Helicopters Manual
Next
Table 1. Values of "A" for Drill Stop Depth Setting

TB 1-1520-251-20-13
CAUTION
If the ring position can not be shifted, peel the ring off the flange and
repeat the entire repair procedure with a new ring.
9.59
Allow the fixture to remain clamped in place for 90 minutes. The adhesive will set within this period.
CAUTION
The adhesive will not reach full performance characteristics until the
cure time has exceeded 24 hours.
9.60  After the 90 minutes set period has elapsed, insert a #42 drill bit, point first, into the depth gage block
until the drill bit stops.
9.61
Slide the drill stop on the drill bit until it is flush against the gage block.
9.62
Tighten the drill stop to the bit.
9.63  Remove the bit from the gage block and make sure of the drill stop position as shown in Figure 6 and
11

Privacy Statement - Press Release - Copyright Information. - Contact Us