Click here to make tpub.com your Home Page

Page Title: Figure 1. Generator Flanfe Cross-Section Through an Existing Filled Pin Hole.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
PROCEDURES
Up
TB-1-1520-251-20-13 Replacement of Flange Ring on Electrical Power - Generator A.C. for AH-64D Helicopters Manual
Next
Figure 2. Adhesive Labels Marking Previous Pin Locations

TB 1-1520-251-20-13
9.21  Thoroughly moisten several general use wipes with water and wipe all surfaces treated with the
conversion coating.
9.22
Continue to wet wipe the areas until no residue is found on the cloths.
9.23
Dry wipe all the damp surfaces with the lint free wipes until all moisture is removed.
9.24
Properly dispose of all materials contaminated with the conversion solution.
9.25  Locate all previous pin locations and mark these with adhesive labels (or a marking pin) on the flange
face near the edge. See Figure 1 and Figure 2.
Figure 1. Generator Flanfe Cross-Section Through an Existing Filled Pin Hole.
5

Privacy Statement - Press Release - Copyright Information. - Contact Us