Click here to make tpub.com your Home Page

Page Title: Correction Procedures cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Correction Procedures
Up
TB-1-1520-238-20-88 AH-64 Inspection of Fusleage Station (FS) 176 Frame for Cracking Around the Web on Aircraft Manufactured Prior to Tail Number 84-25351 Manual
Next
Supply/Parts and Disposition

TB 1-1520-238-20-88
personnel/procedures.
b. If cracks are found contact technical POC for repairs. Aircraft is unserviceable until repaired.
(1) The status symbol will be updated to a red //X//.
(2) Submit a category 1 deficiency report and indicate crack locations.
k.
On or before next phase move two lines (pitot and static) on upper right hand FS 176 frame to allow proper visual and
eddy current inspection of these holes.
I.
Reroute the pitot and static lines as follows:
(1) Remove the following items lAW reference 13.a:
(a) APU Panel, PLT RH Console.
(b) IFF Control Panel, PLT RH Console.
(c) VHF Radio, PLT RH Consol e.
(d) Refuel Panel.
(e) Access Door, located on transmission deck, beneath right hand Transformer rectifier.
(f) Ammo pack.
(g) Wire bundle clamp HS4271-3510 located on aft side of FS 176 frame (clip must stay installed on the
frame).
(h) Right hand Transformer rectifier
(2) Cut pitot and static lines 8 inches aft of FS 176 frame. Reference figure 1.
(3) Cut convoluted tubing at clamp located forward of FS 176 frame and remove.
(4) Access the pitot line in the pilot right hand console. Cut line 12 inches forward of grommeted pass through
at FS 145. Remove chafe tape. Reference figure 1.
(5) Access static line and disconnect from "T" fitting in pilot right hand console. Remove swagelok.
(6) Remove pitot and static lines between FS 176 frame and console.
Make sure not to dislodge any
grommets.
(7) Install new tubing between FS 176 frame and console. New tubing should follow same path through all
bulkheads and grommets, except in the following cases:
(a) Convoluted tubing will not be used in new installation.
(b) New tubing will route over fuel filler neck.
(c) New tubing will route through new pass through location in FS 176 frame.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us