Click here to make tpub.com your Home Page

Page Title: If the part number 1168100-505 is installed
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
PROCEDURES/INSTRUCTIONS FOR ASSEMBLIES/COMPONENT/PARTS IN WORK OR IN STOCK
Up
TB-1-1520-238-20-130 Main Landing Gear Upper Shock Strut AH-64 Series Helicopters Manual
Next
POINTS OF CONTACT ­

TB 1-1520-238-20-130
10.1.1 If the part number 1168100-505 is installed ­
Nomenclature
Part No./NSN
Qty
Cost ea.
Total $
Shock Strut, Main
1168100-505
2
$16271.00
$32542.00
Landing Gear
1620-01-147-4775
Total cost per aircraft= $32542.00
10.1.2 If the part number 1168100-507 is installed ­
Nomenclature
Part No./NSN
Qty
Cost ea.
Total $
Shock Strut, Main
1168100-507
2
$21706.00
$43412.00
Landing Gear
1620-01-465-9232
Total cost per aircraft= $43412.00
10.2 Bulk and consumable materials ­
Nomenclature
Part No.
NSN
Chemical Stripper
N/A
8010-00-149-9273 (1 pint)
Chemical Stripper
N/A
8010-00-181-7568 (1 gallon)
Primer
MIL-P-23377
8010-01-441-6031 (10cc)
Topcoat
MIL-C-46168
8010-01-316-2219 (1 gallon)
10.3 Requisitioning instructions ­ Requisition replacement parts using normal supply procedures. All
requisitions shall use project code (cc 57-59) "X24" (X-ray-Two-Four).
NOTE
Project code "X24" is required to track and establish a data base of
stock fund expenditures incurred by the field as a result of message
action.
10.4 Disposition of discrepant parts/components ­ Hold pending disposition instructions from Log poc.
10.5 Disposition of hazardous material ­ IAW Environmental Protection Agency directives as implemented
by your servicing environmental coordinator (AR 200-1).
11. MAINTENANCE APPLICATION ­
11.1 Category of maintenance ­ AVUM for the visual inspection. AVIM for the magnetic particle inspection.
11.2 Estimated time required ­
11.2.1 Time to complete visual inspection ­ total of 1 man-hour using 1 person.
11.2.2 Time to complete the magnetic particle inspection ­ Total of 20 man-hours using 2 persons with 10
hours downtime per end item.
12. PUBLICATION REQUIREMENTS ­
12.1 References ­
12.1.1 AR 95-1.
12.1.2 DA Pam 738-751.
12.1.3 TM 1-1520-264-23, Aviation Unit and Intermediate Maintenance Manual Nondestructive Inspection
Procedures for AH-64A Helicopter, 30 Novmber 1996.
12.1.4 TM 1-1520-238-23, Aviation Unit and Intermediate Maintenance Manual for AH-64A Apache Attack
Helicopter, 16 May 1994.
5

Privacy Statement - Press Release - Copyright Information. - Contact Us