Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: REVIEW ANSWERS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

 

Back
SUMMARY
Up
Military Requirements for Petty Officers Third and Second Class
Next
Chapter 8 Military Responsibilities and Duties

REVIEW ANSWERS A1. (2) The first 4 digits of the NSN make up the FSC. In 5330 00 010 4960 the first 2 digits of the FSC are called the FSC group, and the last 2 digits are called the class. A2. (3) All material purchased and maintained by the federal government is maintained by national stock number. A3. (No) Although NOT part of the stock number, the cognizance symbol may be prefixed to the stock number in some supply publications. However, the cog symbol is not prefixed to the stock number on supply documents, forms, and records. A4. (3) Items specially designed, manufactured, and tested for use in nuclear reactor plants, which require special handling, machining, and so forth before being installed and used require a SMIC. A5. (1) Its technical nomenclature operating characteristics, technical manuals, and so forth are described.  It is a supply document in that the COSAL provides a complete list of parts required to operate and maintain the equipment. A6. (2) The ML-N omits cryptographic and cryptologic items which are listed in security classified catalogs produced by the respective DoD agencies. A7. (4) As the name implies, MILSTRIP is used for all transactions from requisitioning of material to issuing the material. A8. (4) All of the listed documents are MILSTRIP requisitioning documents used to order material. A9. (3) The bottom section of the DD Form 1348-6 permits the inclusion of all available technical or descriptive data.  This data will assist the supply source in the identification and procurement of the requisitioned item. A10. (2) The priority designator is determined by using the table of priority designators. A11. (4) The priority designator is based on a scale of 01 to 15 with 01 being the highest and 15 being the lowest priority. A12. (2) Do not cannibalize components you might use sometime in the future. 7-19

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing